![]() | |||
Assembling a small tea house | |||
![]() The tea house fabricated in my shop sits on my trailer, ready to be delivered. |
![]() Meanwhile, a patio of Goshen Stone was constructed for the tea house |
![]() Placement of the first half of the tea house |
![]() Second half of the tea house ready to be moved |
![]() The two halves are set |
![]() Assembling |
![]() Installing the back pieces |
![]() Installing the front pieces |
![]() Installing the rafters |
![]() Detailing the front of the tea house |
![]() Rafter detail |
![]() The completed tea house |